Offshore Wind Turbine Project – Pile Gripper, MPI Resolution

Project Details

A Danish construction company working on the vessel MPI Resolution asked us to assist with their Pile Gripper system for launching the 300 ton piles off the vessel into the seabed.

  •   We designed a 4 way synchronised lift system to raise and lower the 365 ton pile gripper.
  •   The power pack was enclosed in a weatherproof stainless steel cabinet to protect it from the harsh environment.
  •   Double acting cylinders with pilot operated check valves fitted, ensured a safe operation.

  Design, Enerpac, Installation, Offshore, Projects


PreviousListing
Contact Us

Do you have a new or similar project in mind? Talk to one of our experienced staff to talk about the best options available to you.